Route Map - Virar-alibaug Multimodal Corridor
The total estimated project cost is approximately ₹55,000 to ₹64,000 crore .
The corridor starts at and terminates at Balavali (near Alibaug) . It acts as a "half ring road" for the Mumbai Metropolitan Region (MMR), integrating with multiple national highways and mega-projects. Major Intersections & Connections The route is strategically aligned to link with: virar-alibaug multimodal corridor route map
While the Virar-Alibaug Multimodal Corridor has the potential to transform Mumbai's suburban development, there are several challenges that need to be addressed: The total estimated project cost is approximately ₹55,000
The Mumbai Metropolitan Region (MMR) has witnessed rapid urbanization and population growth, leading to increased pressure on existing transportation infrastructure. The need for a efficient, reliable, and sustainable transportation system has become imperative. The Virar-Alibaug Multimodal Corridor is designed to address this need by providing a seamless and integrated transportation network. Major Intersections & Connections The route is strategically
Mumbai's real estate and infrastructure landscape is set for a massive shift. The isn't just a new road; it is a 126-km economic lifeline that will redraw the map of the MMR (Mumbai Metropolitan Region).

