The physical installation process involves mounting the control chassis, inserting I/O modules, and wiring field devices. Refer to the quick-start poster included with your shipment, but follow these steps for precision.
BECSys5 uses a hardware-locked license via a USB dongle (Sentinel HASP). becsys5 installation and technical manual
Configure to log up to 1,000 tags at 1-second intervals. inserting I/O modules
For each AI channel (Web UI → I/O → Calibration): becsys5 installation and technical manual
Enable and User Action Logging :
Install the flow cell plumbing and perform a pressure test before any electrical work. This ensures no leaks will interfere with the electronic sensors. 2. The Connection: "Wiring and Power"